Leopold Sedar Senghor Airport (Dakar)

Leopold Sedar Senghor Airport (Dakar)

In 2006, the Senegalese Government asked to the Libanese Contractor: ‘Zackhem’ to extend the current airport, and build a new departure terminal.

Together with ‘SGE Equip’ (Daikin’s sales contact in Senegal), they studied different air conditioning solutions and finally opted for a Daikin Air cooled Chiller systems.

InstallerSGE Equip
Year2007
Units2 x EWAP460MBYNN & Duct FCU
Capacity920 Kw



Dakar airport1

Dakar airport2

Dakar airport3